Maintenance cost savings calculator
What is your unplanned downtime worth?
Every figure below is yours. Nothing is assumed about your plant, and no benefit is claimed that your own numbers do not produce. Change an input and the answer changes with it.
The line
Start with one critical line or one plant — whichever you can put real numbers against. Example figures loaded
The hours the line is meant to run in a year, after planned shutdowns. Used to show downtime as a share of that time.
Breakdowns and unplanned stops only — not planned shutdowns or changeovers.
Downtime is more than the scheduled hours — check both figures.
What a maintenance programme can reach
Not all downtime is maintenance. Set the share you believe a proper programme addresses — keep it conservative, and let a pilot prove it.
The store
The analysis sorts spares into what nothing warns you about (hold it) and what the plan already dates (order it). The second group is where capital is usually trapped.
A review pool is not a saving until someone stops re-ordering. Ten per cent in the first year is a defensible starting assumption.
What it costs you
Enter what you would expect to pay, or leave it at zero to see the gross benefit alone.
Where it comes from
If the share we reach is different
The one number nobody can promise. Here is the answer across the range.
| Addressable | Hours back | Margin recovered | Net |
|---|
PM Strategy is a decision-support tool: every task, interval and spare it proposes is reviewed and approved by the plant's responsible engineer before use. This calculator performs arithmetic on the figures you enter and makes no claim about your plant.