EXLATECH
A cement plant control room: two operators at their screens and a supervisor with his hard hat in hand

Preventive maintenance optimization

Every task traced to the failure it prevents.

RCM-based maintenance plans built from how each machine fails, with the reason on every task, laid out for your CMMS.

A grain terminal's silos and head-house tower at dawn, by the sea

Start from the register

Every machine, ranked by risk.

Safety, quality, output, environment and repair cost, scored for each machine. Effort goes where it protects the most.

  • One critical line or the whole plant
  • Any severe safety or food-safety risk is class A
A control valve on a clean, insulated process line

Built from the failure modes

The right task for every way a machine fails.

Each way a machine can fail gets the right kind of task: condition-based where a warning exists, time-based where it doesn't, and a function test for the protection nobody sees working.

  • Uses ISO 14224 failure codes and RCM practice (SAE JA1011)
  • Starting intervals, trades and hours on every task
A pack leak test in a clear tank on a clean steel table

Checked, then into your CMMS

Every plan, ready for your CMMS.

One Excel workbook laid out for SAP PM, IBM Maximo or Oracle EAM: the plans, the operations and the reason behind each one, with a sign-off line for your engineer.

  • A file in your system's vocabulary, not a live connection
  • PM compliance you can explain, task by task

What it means for you

What PM Strategy changes, and for whom.

For the plant manager

  • No hidden failure left untested.
  • A maintenance plan you can defend.
  • Less firefighting, more planned work.
  • One workbook for your CMMS: no retyping.

For the business

  • Fewer unplanned stops.
  • Maintenance spend goes where the risk is.
  • Audit-ready records.
  • Know-how kept in the plant, not in one person's head.
Orin AI

The engineering intelligence built into every OPEX Suite app, working alongside your engineers. They stay in charge of every decision.

What it replaces

Out with the guesswork. In with the reasons.

TodayWith PM Strategy
Tasks copied from the last plant or the manualTasks built from how each machine actually fails
Effort spread evenly across the plantEffort where the risk is, machine by machine
"Why this task?" lost in a spreadsheetThe reason written beside every task
Only time-based tasks, whatever the failureCondition-based and time-based tasks, each where it fits
The plan retyped into the CMMS, line by lineOne workbook laid out for SAP PM, IBM Maximo or Oracle EAM
Audits answered from memoryEvery decision written down, with a sign-off line

Start small

Start with one critical line.

Bring your own machine register. See its programme built, and judge it on your own plant.

  1. We take one critical line from your register.
  2. Your engineers check the failure modes and tasks with us.
  3. You get the workbook for your CMMS, with the reasons.

See your own machine's programme built.

Book a 30-minute demo, or ask us to walk through your own machine register.

Prefer to talk? We'll call you back within 24 hours.

Request a call-back