Flour mill and grain silo maintenance, from the quay to the roller mill.

Bucket elevators, conveyors and roller mills that have to run when the ship is in. Keep them running, plan the mill shutdown from the failures, and see every site before 8 a.m.

Where the losses hide

Where grain handling and milling lose time.

Bucket elevators

Belt slip, the switch that should stop the elevator, and bearings nobody hears.

Conveyors and intake

Take-ups, tail pulleys, dust and spillage under the galleries.

Roller mills

Roll wear and the mill shutdown that has to be planned right.

One case, start to finish

Sunday's missed target, owned before 8 a.m. on Monday.

  1. 01

    On the board by 6:30

    Sunday's miss is on the Plant screen on Monday morning, and owned before 8 a.m.

  2. 02

    The cause, proven

    The quay conveyor kept tripping at full rate and everyone blamed the unloaders. EDPS found a jammed take-up.

  3. 03

    Fixed, by the clock

    The fix proved itself over the test period, and the site was back on target two days later.

  4. 04

    In the plan

    The switch that stops the elevator when the belt slips had never been tested. Now it is, with a reason.

A case from our grain and flour demonstration plant.

A grain terminal's silos and head-house tower at dawn, by the sea

Advice as well as software

Need help on the floor too?

TPM and operational excellence consulting with your own team: see how we work with plants.

Other industries

Bring one machine that keeps stopping.

In a 30-minute demo, we'll show you how the four apps handle it, from the first tag to the fix that stays.

Prefer to talk? We'll call you back within 24 hours.

Request a call-back